• Courses
  • Consulting
Raise the bar Raise the bar
  • Courses
  • Consulting

Archives

Solving a long-time air bubble mystery
0

Solving a long-time air bubble mystery

A flower bulb company had a long-time problem with air bubbles in their pumping system. Through the years they had tried everything to solve the problem.

READ MORE
Saving 50 pumps with a new tube well design in Dhaka
0

Saving 50 pumps with a new tube well design in Dhaka

Wells in Dhaka usually had a lifespan of about one year before the amount of drinking water would drop. We showed how another design can provide a reliable supply of water for more than twenty years.

READ MORE
Improving the MTBF from weeks to years in Bangladesh
0

Improving the MTBF from weeks to years in Bangladesh

In Dhaka, a borehole pump's average lifespan was 3 to 12 weeks before the drinking water company had to exchange it for a new pump.

READ MORE
Made with ♥ in Wageningen, The Netherlands.
Copyright 2013-2025 Oveducon, All rights reserved.